π0.5 Piper Take-Cup-Off-Rack LoRA

OpenPI/JAX π0.5 LoRA checkpoint trained for 5,000 steps on take_off_cup_short16_dual14d_pi05_rgb224_v21 (16 episodes, 9,065 frames).

The exact language prompt is:

take the cup off the rack and place it on the plate

Runtime contract

  • RGB inputs: top, left wrist, and right wrist, letterboxed to 224×224.
  • State/action: 14-D [L_j1..j6, L_gripper_m, R_j1..j6, R_gripper_m]; the 12 joint targets are trained as state-relative deltas and both grippers remain absolute.
  • Recorded action supervision contains absolute joint-angle targets in radians.
  • Grippers are meters and are clipped to [0, 0.08] at the policy boundary.
  • Action horizon: 30.
  • OpenPI config: pi05_piper_take_cup_lora.

Normalization statistics under assets/ and the bundled OpenPI overlay are required. The validation report checks checkpoint loading and inference pipeline integrity; it is not a real-robot success-rate evaluation.

Downloads last month

-

Downloads are not tracked for this model. How to track
Video Preview
loading